INSTALLATION OF MOTOR CONTROL CENTRE FOR UREA PLANT | 11/07/2025 |
REMOVAL OF EVAPORATOR (E221 A&B) SHELL OLD CLADDING WITH PATCHES AND TO REINSTALL NEW CLADDING (ALREADY ROLLED) IN UREA PLANT DURING TAR 2025. | 11/07/2025 |
REPLACEMENT OF FABRIC TYPE EXPANSION JOINT ASSEMBLIES AT PRIMARY REFORMER BURNER LEVEL COMBUSTION AIR DUCTS IN AMMONIA PLANT DURING TAR 2025 | 10/07/2025 |
GAUGE PRESSURE TRANSMITTER | 10/07/2025 |
RENEWAL OF CORRODED INTERCONNECTING CHANNEL SEGMENT AND MAIN BEAM PATCH-UP BENEATH THE NOZZLE FLOOR OF UREA PRILL TOWER IN UREA PLANT DURING TAR 2025 | 08/07/2025 |
PIPE CARBON STEEL – 3 ITEMS | 07/07/2025 |
EXCHANGERS AND CONDENSERS OPENING FOR HYDRO-JET CLEANING, TUBE LEAK FIXING & BOXING UP IN AMMONIA PLANT DURING TAR 2025 | 05/07/2025 |
STUD BOLTS WITH TWO NUTS - SIZE: 1-1/8 | 07/07/2025 |
THERMOCOLE SLAB – 1000 NOS. | 07/07/2025 |
GATE VALVE FLANGED – 3 ITEMS | 04/07/2025 |
PROCUREMENT OF CARBON RING ASSEMBLY CONSISTING OF CARBON RING IN THREE SEGMENTS | 03/07/2025 |
PIPERACK, CABLE TRAY SUPPORTS, VESSEL PLATFORMS & SUPPORTS REPLACEMENT AND OTHER STRUCTURAL JOBS IN AMMONIA PLANT DURING TAR 2025 | 03/07/2025 |
REFORMER APH INLET, OUTLET DUCTS & FABRIC EXPANSION JOINTS REPLACEMENT AND APH CASING PLATE REPAIR DURING TAR 2025 | 02/07/2025 |
GAS ACETYLENE | 02/07/2025 |
PLUG VALVE FLANGED 6 INCH – 2 Nos | 01/07/2025 |
PROCUREMENT OF TUBE BUNDLES FOR E151 LIQUID DISTRIBUTOR REFLUX COOLERS IN UREA PLANT | 30/06/2025 |
PROCUREMENT OF END CAPS ASSEMBLY | 30/06/2025 |
REWINDING OF LT MOTORS IN MFL DURING 2025-26 | 30/06/2025 |
GATE VALVE FLANGED – 2 ITEMS | 30/06/2025 |
SPARES FOR BAG CLOSING MACHINE – FEED-ROCKER | 30/06/2025 |
TRANSMITTERS | 30/06/2025 |
CARRYING OUT ULTRASONIC THICKNESS, ULTRASONIC FLAW TEST SCANNING(UT),MAGNETIC PARTICLE TESTING (MPT)AT MFL SITE | 29/06/2025 |
SPARES FOR DRO PLANT – 1ST STAGE HP PUMP – 28 ITEMS | 27/06/2025 |
ALUMINIZED FIRE PROXIMITY SUIT | 27/06/2025
|
4WAY BALL VALVE -4 Nos | 26/06/2025 |
METAL TUBE ROTAMETER | 26/06/2025 |
SPARES FOR UNION BAG CLOSING MACHINE – 4 ITEMS | 27/06/2025 |
FIBRE GLASS CLOTH – 3000 SQMT | 26/06/2025 |
SAPRES FOR WATER TREATMENT PLANT – 3 ITEMS | 25/06/2025 |
SPARES FOR UNION INDUSTRIAL SEWING MACHINE & HEAD – 14 ITEMS | 26/06/2025 |
JUNCTION BOX – 10 Nos | 26/06/2025 |
I/P CONVERTER | 25/06/2025 |
PNEUMATIC VALVE POSITIONER | 25/06/2025 |
BALL VALVE AIR SET – 6 ITEMS | 25/06/2025 |
GATE VALVE SIZE:3/4” & 6”X 150 PSI | 25/06/2025 |
MULTICORE CONTROL CABLE | 24/06/2025 |
REFRACTORY CASTABLE WHYTHEAT – 3000 Kgs | 24/06/2025 |
WELDING ELECTRODES D & H – 6 ITEMS | 24/06/2025 |
STEAM TRAPS – 3 ITEMS | 23/06/2025 |
APPOINTMENT OF RAILHEAD HANDLING, FOL & PRIVATE WAREHOUSE CONTRACTORS | 18/06/2025 |
LRB MATTRESS 50 MM THICK – 3000 SQMT. | 20/06/2025 |
IN-SITU RE-TUBING OF E-1221 START UP COOLER IN AMMONIA PLANT DURING TAR 2025 | 19/06/2025 |
DIFFERENTIAL PRESSURE TRANSMITTERS | 19/06/2025 |
TURKISH TOWEL – 654 Nos. | 18/06/2025 |
STATE WISE SUPPLY OF VARIOUS FERTILIZERS GRADES NPK 15-15-15, 16-16-16, 10-26-26, 24-24-0, 20-20-0-13, AMMONIUM SULPHATE AND MURIATE OF POTASH (MOP) PER FCO STANDARDS IN 50 KG PACKING FOR TRADING | 18/06/2025 |
FLANGE SOFS-FF-36 INCH | 17/06/2025 |
REMOVAL, SERVICING / RE-CONDITIONING, TESTING AND RE-FIXING OF SAFETY RELIEF VALVES DURING TAR 2025 | 17/06/2025 |
METHYL DIETHANOLAMINE (MDEA) – 40 MT & PIPERAZINE - 04 MT | 16/06/2025 |
LED INTERACTIVE DISPLAY | 12/06/2025 |
FABRIC EXPANSION JOINT – 2 ITEMS | 12/06/2025 |
LIQUID CHLORINE CYLINDERS – 510 MT | 12/06/2025 |
HEAT EXCHANGER COVER OPENING AND BOXING UP AFTER HYDRO-JET CLEANING & TUBE LEAK FIXING IN UREA PLANT DURING TAR 2025 | 12/06/2025 |
HYDRO-JET CLEANING OF HEAT EXCHANGERS CONDENSERS & COOLERS IN AMMONIA AND UREA PLANTS DURING TAR 2025 | 12/06/2025 |